Make EPD Requirements Work for Your Team

21.10.2026 12:00 PM

Meet the Speakers

Jeff Schaefer

Quality Control Manager

Kienstra Ready Mix

LinkedIn

Drew Schlegel

Account Executive

Climate Earth

LinkedIn

Table of Contents

How Kienstra Ready Mix bids concrete jobs with EPDs and GWP targets

Webinar replay · 41 minutes · Includes the audience Q&A

When a contractor calls Kienstra Ready Mix for a price on “low carbon concrete,” Jeff Schaefer needs three things before he can quote the job. What benchmark is the owner using? Does the target apply to each mix or to the whole job? How many cubic yards will the contractor place with each mix?

Schaefer, Kienstra’s director of technical services, explains what his team learned supplying concrete in Missouri and Illinois. Climate Earth’s Drew Schlegel then works through a Florida data center bid example, from the mix specification to a report that pairs each proposed mix with its environmental product declaration (EPD). The number they track is global warming potential (GWP), a measure of greenhouse gas emissions expressed in carbon dioxide equivalents.

What We Covered

1. When does a ready-mix producer need a concrete EPD to bid?

On Kienstra’s first federal building bid, the contractor needed an EPD for each requested mix before Kienstra could be considered for the job. Kienstra had already prepared one plant to produce EPDs. When the request came in, the team ran its everyday mixes through the program and found that some already compared favorably with the benchmark.

Other customers wanted different answers. Local high-rise teams wanted to understand the carbon impact of concrete they were already using. Data center owners gave Kienstra reduction goals ranging from 10% to 35%. On Chase Bank work, the owner wanted footings and foundations to reach a particular reduction and recognized that floor slabs might need a different mix. Schaefer met with the bank to work through those choices, supplied EPDs and said Kienstra went on to do more of its work.

When a contractor asks for a price on “low carbon concrete,” sales needs the project spec. Which benchmark does it name? What reduction does the owner want? Which placements does it cover? Schaefer said nearly all the benchmarks he encountered were NRMCA’s, but the federal job used GSA’s. The same mix can look different depending on what the owner compares it with.

“We had to be able to send a bid in with the mixes they needed with the EPDs before you could even be considered.” — Jeff Schaefer, 02:34

2. How did Kienstra’s 4,000 psi concrete with 20% fly ash compare with the benchmark?

Schaefer reported that a typical Kienstra 4,000 psi mix with 20% Class C fly ash came in 11% to 13% below the National Ready Mixed Concrete Association (NRMCA) benchmark for that strength. Two plants using the same replacement percentage could land at different points in that range. For a bid, that makes the supplying plant’s EPD the place to check the number sales can quote.

Schaefer pointed to a local advantage. Kienstra has three cement suppliers nearby, local fly ash and short hauls from aggregate sources. That 11% to 13% is a comparison with the regional benchmark. To find out how much the fly ash itself changed GWP, QC would need to compare the plant’s mix before and after the substitution.

He also addressed freeze-thaw performance in the Q&A. Kienstra had seen no failures of the kind the audience member described, and its exterior concrete used mixes similar to those its local transportation agency had used on bridge decks. Hear the plant-by-plant comparison at 30:03.

3. What did replacing 200 pounds of portland cement with slag change in the demo?

The swap lowered the modeled GWP of a 3,000 psi Florida mix by about 23%. Schlegel started with a straight portland cement mix. The EPD generator showed that cement production accounted for about 80% of its GWP. He replaced 200 pounds of cement with 200 pounds of slag and showed the result immediately. The modeled GWP went from 381 to 294. He then reset the recipe and tried a blended cement at the original cement quantity, so viewers could see the two options separately.

The same screen showed why a quality control team might call an aggregate supplier next. It listed production and transportation separately, making it possible to see when the trip from the quarry was a significant part of an aggregate’s contribution. See the material swap at 12:17.

4. How do you lower a footing mix’s GWP and still meet the specification?

Start with the requirements for that placement and the materials available at the supplying plant. The sample specification covered seven applications. For the footings, Schlegel checked strength, slump, air content, water-to-cementitious materials ratio and permitted materials. He also showed how to go back to the page where a requirement appeared.

The specification had no mix-specific GWP cap for the footings, so Schlegel added one for the exercise. The starting mix missed the strength, water ratio and carbon targets. Using materials available at the Florida plant, the mix designer suggested Class F fly ash and less cement. The revised design showed a water-to-cementitious materials ratio of 0.40 and a modeled GWP below the target. Schlegel also showed where QC judgment comes in. A mix intended for a December pour may need different set characteristics than a summer mix. With the plant’s sieve data, QC can check combined aggregate gradation on the Tarantula Curve, then choose which candidate to trial batch. Follow the footing mix redesign at 16:51.

“We could go to the lab, trial batch a few mixes, and then end up generating an EPD just based off of how it’s performing.” — Drew Schlegel, 23:24

5. Can a concrete bid meet a 15% project GWP target if the slab falls short?

Yes, when the owner evaluates the concrete package by volume. The bid report multiplied each mix’s GWP by the cubic yards proposed for that placement, then compared the total with the benchmark for those same volumes. In the Florida data center example, the slab-on-grade mix was only 6.75% below its regional benchmark. A footing mix was 25% below its benchmark. Counting the proposed cubic yards of slab, column and footing concrete, the bid totaled 54,600 kg CO₂e against a benchmark of 67,900 kg CO₂e. That put the package about 20% below the benchmark, enough to clear the 15% target.

Schaefer explained why that flexibility matters on a jobsite. A floor slab may need to set in time for the crew to saw-cut it. When the target applies across the job, quality control can keep that slab mix and look for a larger reduction in the footings. See the project totals at 26:24.

6. What quantities should the contractor provide for a project carbon calculation?

Ask for cubic yards by placement and proposed mix. Schaefer described getting quantities grouped into foundations, interior concrete and exterior concrete. When he submitted the calculation, the engineer asked where the pan stairs were. Thousands of yards had been counted, but the engineer still couldn’t tell which mix and quantity covered that placement.

“You need to know every single application, what mix is going in it, how many yards are in each application.” — Jeff Schaefer, 05:15

For the next bid, ask for the contractor’s takeoff while there’s still time to resolve missing quantities. Match each placement to its plant, mix code, EPD and cubic yards. The bid report Schlegel downloaded showed the overall reduction and included the mix EPDs, so the reviewer could trace the project total back to the concrete being quoted. For the handoff to sales, the demo showed a choice of formats. The bid report expressed the reduction as a percentage, while the ACI 323 output displayed a ratio. That distinction matters when an owner asks sales to show, in plain terms, how far below the benchmark the bid comes in. Hear the pan-stair example at 34:32.

What to take back to your next bid. Ask the contractor for the takeoff and the owner’s carbon language while sales is still pricing the job. Start with mixes the supplying plant already produces. If the target is project-wide, use the yardages to see which placement can deliver enough reduction while giving the finishing crew the slab it needs. That gives sales a specific answer to the owner’s question: here are the mixes we can supply, the reduction across your job and the EPDs behind it.

Talk to Climate Earth about concrete EPDs for your next bid

Full Webinar Transcript

How Kienstra Ready Mix bids concrete jobs with EPDs and GWP targets

00:01 · Welcome and introductions

00:01 · Drew Schlegel
Awesome. Hey, everyone. It's Drew from Climate Earth. Thank you for joining Jeff and I today. The reason for the conversation today is, you know, you're hearing me talk too much. We needed an actual, you know, QC guy to get on here and tell you about his experiences, right? And what he's seeing pop up on jobs. So that's why we invited Jeff to the conversation today. So first half Jeff's gonna talk a little bit more about his company, Kienstra and then we're gonna kinda transition into a little live demonstration later where I can give you, like, the rundown on it...

00:36 · Drew Schlegel
Rundown on how Jeff is, actually, you know, hitting these GWP reduction requirements and hitting these EPD requirements on jobs. So with that, Jeff, take it away.

00:47 · Jeff Schaefer
Yeah. Good afternoon, everybody. So I work for Kienstra Ready Mix. We've been producing concrete since 1947. So we've kind of operated on one simple promise, a quality product at a fair price with excellent service. So from 1947 to today, we've grown into 30-plus plants in Missouri and Metro East Illinois. We service commercial jobs, municipal jobs, infrastructure, and residential, and we're a privately family-owned company, kind of transitioning into our fourth generation, and we operate our team based on the goals of attitude, ability, and work ethic.

01:29 · Jeff Schaefer
Obviously, two of those three the person can control. The third one we can teach. So that's just kind of a little bit about Kienstra.

01:45 · The federal bid that first required concrete EPDs

01:45 · Jeff Schaefer
So when it comes to the EPDs and GWP limits our first experience with GWPs and EPDs was probably three or four years ago. So what really got us started into it was the Executive Order 14057, which was Buy Clean Act. So we kind of hear- started hearing more and more about that and kind of discussed it internally and decided that we would have to reach out and get one of our plants certified to begin with to be able to produce EPDs.

02:21 · Jeff Schaefer
So soon after that happened, it just so happened we were contacted by a, a contractor that was doing a federal building that was managed by the General Services Administration. So to be able to do that, we had to be able to send a bid in with the mixes they needed with the EPDs before you could even be considered. So that was kind of our first experience with it, and in doing so, you know, running our mix designs through the EPD program, we kind of quickly learned that just based on the mixes we do every day, mixes were already having some pretty decent carbon reduction goals just with what we use in general.

03:05 · Jeff Schaefer
So then you fast-forward a little bit. So the Midwest was kind of slow to get on the EPDs, so still kind of a work in progress with, with how many jobs actually require them. But we started doing banks with Chase Bank, and I had a bunch of different meetings with them because they wanted low embodied carbon concrete and kind of weren't sure which direction to go. So after meetings, we kind of pointed them in the right direction and gave them EPDs, and ever since then we do a lot of their work.

03:41 · Jeff Schaefer
And we have some other local works, some local high-rises that didn't necessarily need EPDs but were kind of interested in what they were actually getting in regards to carbon reduction with the mixes they were using on their high-rises.

03:56 · Data center carbon targets and slab finishing schedules

03:56 · Jeff Schaefer
So we were able to do that, and then now you fast-forward to now, data centers seem to be popping up everywhere. They are really interested in the carbon reduction. So depending on which data center you're on, the carbon reductions can be as low as 10%, as high as 35%. So when we do those it's really important to know the materials you're using and how they affect what your carbon limits are gonna be.

04:26 · Jeff Schaefer
So we do Amazon. That's a, a big one for 35% reduction goal, and we probably have 75 EPDs in the queue, so when it comes time to bid these jobs, we kind of already have a good idea on what it takes to meet the requirements that these owners want. Now, the biggest thing on the carbon reduction goals is understanding that it's not necessarily every mix that has to be that carbon reduction. It's usually winds up being the job as an average.

05:01 · Jeff Schaefer
So this allows you to get more aggressive on some applications and less aggressive on other applications like floor slabs or something that needs to set and get saw cut quickly. But to get there, you got to really be like the squeaky wheel with the contractors because you need to know every single application, what mix is going in it, how many yards are in each application, and sometimes that information can be a little cumbersome to get.

05:28 · Jeff Schaefer
So this actual program that Climate Earth has, if you have all that information, which I'm sure Drew will talk about later, it'll do all these calculations for you, which before you had to put it all on a spreadsheet and do a bunch of math and figure out where you were and where the baseline was and where you wind up before you even bid the job. But that's pretty much our experience with what it is so far.

05:55 · Local materials, haul distances and pricing a low-carbon mix

05:55 · Jeff Schaefer
And then, like I said before, knowing, knowing what you have in every mix, you know, obviously cement's gonna be the biggest contributor to the, carbon. So removing cement and replacing it with SCMs, fly ash, slag, whatever you have available. There's ad mixes out there that can enhance the strength while reducing the cement. So anything to lower the carbon content. Aggregates can play a part in it. Luckily for us in this market, we sit on top of all of our materials per se.

06:30 · Jeff Schaefer
So we're surrounded by quarries that have quality limestone, where natural sands, gravels. So we don't have like the haul distances that some of the out of mar- out of this area places have that can really, you know, the, the hauling can affect your GWP number. So even cement and fly ash, you know, we sit on those. We have three local cement suppliers. Fly ash is local. So we have a pretty good handle on knowing what each material in the mix is gonna do for the overall carbon reduction goal.

07:05 · Jeff Schaefer
And then as far as, you know, the, the bid in and, and getting the job, so like I said before, we, we have quite a few EPDs in the queue and published. So our sales guys, when they get the, the bid request, you know, they'll send us the specs over, and always read through the specs, but we already generally have a pretty good handle on what we need to bid to get it, and which mixes are we're gonna use to get the baseline reduction.

07:41 · Jeff Schaefer
So but it's very important though, like I said before, to, to know what you need because that so many jobs have different goals. So one of the things I hear a lot is from the contractor side, that there's not a lot of contractors have a lot of experience with the low carbon and GWP requirements and reductions. So a lot of times we can get phone calls that would say you know, "Hey, do you sell low carbon concrete?"

08:09 · Jeff Schaefer
"Yes, we do." "Well, I need a price for that." And it doesn't kind of work like that. That's where you gotta, gotta ask, "Well, what, what do you actually need? What are, what are you looking for? What kind of reductions?" And that's usually when you hear crickets. So very important to ask and get all the information, 'cause like I said, it's kind of been slow to take off around here, so some people don't have a lot of experience with it.

08:34 · Jeff Schaefer
But far as our experience with the EPDs, that's, that's pretty much it in a nutshell. You know, you know, just really knowing your materials and how it affects the, the mix designs and the Climate Earth platform, the some of the things that they've done and upgraded makes it ten times easier than it was before, which, you know I'm sure Drew, Drew's gonna talk about here. So I can turn it over to Drew, and if you have any, questions for me, put them in the chat or ask them later.

09:03 · Jeff Schaefer
I'll be happy to, answer them.

09:08 · From the contractor’s specification to the producer’s bid

09:08 · Drew Schlegel
Yeah, no, I was gonna say thanks thanks again, Jeff. I would definitely suggest everyone here to send your questions in to Jeff because I'm even curious about, you know, some of the comments he made. 'Cause it can be regionally different, right? Just based off of what's popping up in y'all's area versus his. So would love to, you know, for you guys to ask some questions in the chat. But yeah, Saskia, I think you can go on to the next slide here.

09:37 · Drew Schlegel
So before I get into the, the demo I'm really just gonna talk about Jeff's workflow and, you know, our-- what we envision a ready-mix producer's workflow would be when using our system. So basically we're gonna take a spec kind of try to see what it actually, says see if we have some mixes available to meet some of the applications of this spec. You know, put in our mix designer tool, and then we're gonna throw it into our bid report feature to, to see how it sits.

10:05 · Drew Schlegel
Again, when Jeff was saying kind of that weighted average project GWP reduction goals. We're gonna throw in an application in there and see if we can hit a certain target. And Saskia, you can go to the next slide here. So yeah some tools, as Jeff was mentioning, that we've kind of recently released to help make y'all's jobs a lot easier is that, that spec summarizer, the auto spec review, definitely gonna highlight on that.

10:35 · Drew Schlegel
Highlight on the mix designer to kind of design these low carbon spec or low carbon applications while balancing for, you know, performance characteristics and cost. And then we'll put it into a bid report and then obviously generate an EPD.

10:49 · Comparing cement, slag and transport in a Florida mix EPD

10:49 · Drew Schlegel
So I think I'll take over now, share my screen with y'all, and we can get into it. So the, the easiest update that I want to show you at first is this EPD generator. So the core functionality of the platform where you guys pick a plant. So we're gonna go with Florida, we're gonna go with the straight three thousand psi, you know, straight Portland cement mix, and we're gonna click edit. So from here, we got the plant, the mix code compressive strength.

11:17 · Drew Schlegel
There's also some new optional characteristics based off the new PCR that you can throw in here which we can talk about, you know, later one-on-one if you're interested in learning more. But for now we're gonna go next, and then we're gonna go into each one of the raw materials of this specific mix design. So as you can see, and I'll zoom in here a bit, it's now broken down by A one and A two for each one of these raw materials.

11:43 · Drew Schlegel
Obviously, we still have A three right here but it's a lot more visibility into what's actually going into this overall GWP number. So you can see with our Portland cement, three zero six out of this total three eighty one, you know, GWP is coming from this A one section of the Portland cement. So, you know, if this was Jeff, for example, he might say, "You know, what, what, what would happen if I switched this cement?"

12:12 · Drew Schlegel
Or, "What would happen if I added in a slag or a fly ash?" So here, you know, let's just add in a slag real quick. You know, we'll take out... 200 pounds of this cement, add in, you know, some slag. So as you can see, we're at a 381. Keep that in mind. I'm going to make this switch to 350 and, you know, we'll put in 200 pounds of this slag. We're at a 294.

12:36 · Drew Schlegel
So you can clearly see the reduction that's happened just by making that slag switch. If I take that slag out, go back to the same weight, like same quantity for this, you know, Portland cement, and I make it... I think I have a, a blended cement in here. Put in the blended cement, you know, we're down to a 302 replacement. The cool thing I haven't mentioned, and I think Jeff was mentioning, is sometimes this transport does affect things.

13:08 · Drew Schlegel
So you can see this 57 right here, we got a low A1 number looking great. But 22 you know, is actually pretty, pretty high for this transport score in regards to this aggregate. So maybe I could source this from, from a quarry that's a bit closer to this plant to try to get that 22 down a little bit lower. Same with this sand here is a 17. So these are all just factors that play into your overall GWP score that I wanted to highlight to y'all.

13:37 · Drew Schlegel
There's just a lot more visibility into each one of these raw materials and how it affects this overall GWP score when you're bidding these jobs.

13:50 · Finding requirements for each concrete application

13:50 · Drew Schlegel
So from here, I'm going to get into our newest module, which is this Mix Designer module, and I'm going to come up here and click New Project. So what I'm going to do, show you this first new release that we just came out with is our Spec Summarizer. So if I click the drag and drop button, I'm just going to go to a spec customer had sent me earlier this year, click Open and click Scan PDF.

14:16 · Drew Schlegel
Typically takes about five to ten seconds you know, this time is a bit quicker to look through the entire specification. You can also throw in structural drawings to the Spec Summarizer because a lot of the times, you know, your spec and your structural drawings might have, you know, conflicting language which will be highlighted in this this dropdown menu. So from here, I just entered a spec. I found seven applications.

14:42 · Drew Schlegel
So we got our footings, non-retaining walls, slab on grade, and the whole lot. If I click the dropdown menu here, we can see what it found for this specific application. So I'm going to zoom in for y'all. For the footings application here's the initial mix design requirements. So we got the strength, slump, air content, water to cementitious, max ag size, total cementitious. We got all of our required materials and prohibited materials, as well as project requirements, so like ASR requirements and you can see a lot more as well that goes into this.

15:20 · Drew Schlegel
I'd say one of the favorite parts that I've heard at least from a lot of QC managers is that if you click this little page button, it highlights where all these requirements were found in the specification itself. So for example, Jeff could have a two-screen system up. He could have the spec open on the left Climate Earth open on the right, and he might say, "Hey, where was this, you know, ASR requirement found?"

15:46 · Drew Schlegel
Oh, well, it was page two, section one point five. So that's just simple, you know simple stuff, but it's pretty slick new update that we've made to help save producers a ton of time. I've seen this used by sales teams. You know, the, the sales guys are pretty lazy, and they'll use this for that initial spec review and some of those more commonly seen spec, like the copy and paste specs.

16:17 · Drew Schlegel
And then once they pass those, you know, more complicated specs over to the QC managers to read all the complicated things with, you know, the greenhouse gas reduction requirements QC managers could also use this tool to save them a bunch of time. So from here you can export all this just into a PDF summary too, which is what a lot of the sales guys do. But on the QC side of things you know, as Jeff was saying, he already has, you know, a list of 75 mixes that he could probably make work for this footings application.

16:51 · Redesigning an existing footing mix at the supplying plant

16:51 · Drew Schlegel
We're going to take an existing mix and then kind of further enhance it to hit a certain GWP requirement. So I'm going to take this footings application, click Use This Application. I'm going to choose the plant that we're going to, you know, get this mix out of. So I'm going to roll with Florida here. Footings, you can see all of our requirements are pulled in. There were no GWP limits for the exact mix design on this specification that I put in, but I'm going to throw in a 300 here for the example's purposes, and then I'm going to click New Mix Design here, which brings us into the next new module, our Mix Designer module.

17:32 · Drew Schlegel
So from here, you can see all of the requirements of this footings application are pulled in up top here, and people go about this a number of different ways. The, the least common way is just designing a mix from scratch. I did want to highlight this as possible. So you could design a mix material by material, quantity by quantity to try to, you know, meet the spec. Not common. I'd say the most common way, and again, something that Jeff was mentioning, is he could maybe pull out one of his existing mixes.

18:03 · Drew Schlegel
So I'll just go with that same 3000 PSI straight, you know, Portland cement mix that I showed you earlier. We're going to apply this mix, bring it into the Mix Designer, and see how it sits against the requirements of the specification. So as you can see, you know, water to cementitious, we're a bit off. Strength, we're a bit off. GWP is a 381, We need to be at a three hundred for this specific application of this project.

18:34 · Drew Schlegel
So we got some work to do here, right? We got some further enhancements we could make to this mix. Obviously, you could come here and do that manually, add in different materials, swap materials, swap... Or, you know, change the quantities to try to get it within spec.

18:50 · Using the AI assistant to adjust the mix

18:50 · Drew Schlegel
But I did want to highlight our AI assistant. This was designed by the Concrete Freak, if you guys are familiar, Tyler Ley down at Oklahoma State University. Super interesting guy, super quirky but he's the man. He helped us design this whole AI assistant and mix designer system. A number of different things we can do here. Just a quick example, we could say, "Please adjust this mix to meet spec in regards to you know, water to cementitious."

19:25 · Drew Schlegel
And then, you know, we are also at a three eighty-one GWP, so I'm going to also say, "Please lower, you know, the GWP," and click Send. And what the assistant's going to do obviously it's going to look at all the requirements of this specific footings application. It's going to try to keep us, you know, within the ranges that we've told it to, to get within. And the cool thing is it's, it's, it's going to design a mix that's going to come out of this Florida plant.

19:57 · Drew Schlegel
So it's not going to throw in, you know, if this plant doesn't have fly ash or if this plant doesn't have slag, it wouldn't throw in one of those SCMs. But if it does, it'll, it'll definitely, you know, toss in an SCM because I told it to lower the GWP. Could swap out, you know, that Portland cement for a blended cement. Again, it's all just based off of what's actually at this plant itself.

20:26 · Drew Schlegel
So, you know, let it run a little bit. Obviously, if you don't like the mix it spits out you can always, you know, design a new mix. But as you can see here it looks like it got us to, you know, point four for water to cementitious. It's added in a Class F fly ash. Looks like the cement went down a bit. And if you click this little Mix Generated dropdown button it tells you all the adjustments it's made, and it's told you why it's made these adjustments.

21:01 · Drew Schlegel
So, you know, when you're playing around with this new assistant, this is definitely something I would tell you to take a look at. If, if you're in a cold weather area or a weather area with a lot of variability, you could say, "Hey, please factor in that I'm in you know, middle of nowhere Iowa, and it's December here, so don't, don't be designing me a summer mix." so I'll click Apply here, click Confirm, see how it's the new one sitting against the requirements.

21:30 · Drew Schlegel
You can see we're meeting strength now. We're at a point four, which is great. GWP number I love. We're at a two fifty-four instead of a three hundred, so we're looking pretty good there.

21:40 · Checking aggregate gradation and planning trial batches

21:40 · Drew Schlegel
Also wanted to highlight, this isn't important to everyone, but we do have the tarantula curve built into the system. So, you know, in regards to gradation and particle packing, you can see how the mix sits on the tarantula curve. I did want to highlight that we do need for this to fully work, like if you want this in your Climate Earth instance we have sieve data in here now as well as specific gravity, and then some people will input cost data as well for this you know, to get the full power out of this new system.

22:14 · Drew Schlegel
So I did want to highlight that. And then the last couple of bits we do have this Enhance button. So if you didn't want to use the AI assistant and you just wanted to go with "Hey, I want to see if we can lower the carbon of this mix, or the cost, or the strength, or the workability," simple thing, you can just click this button, click Enhance, and then it'll try to get that, that number down a bit further.

22:44 · Drew Schlegel
And then, yeah, obviously have, you know, sieve analysis up top as well. I'm going to name this, you know, Footings real quick for a data center job. And then from here, if I click Back to Project, this is where it gets really interesting and what-- in regards to what Jeff was talking about for those, like, project level reduction jobs. So you could this mix that we just kind of further enhanced together, right?

23:15 · Drew Schlegel
So we picked an existing mix, further enhanced it a bit. We could keep editing it. We could go to the lab, trial batch a few mixes, and then end up generating an EPD just based off of how it's performing.

23:30 · Calculating the Florida data center’s volume-weighted GWP

23:30 · Drew Schlegel
I did want to show you though that you can add it to a bid report, which brings us to this next new module. I already have one set up for y'all, so it's going to be a data center job that we're going to do. Which again, as Jeff said, is a lot of the times the type of jobs, that we're seeing these requirements, especially with Amazon. So we're in this module now.

23:55 · Drew Schlegel
We got the, name of the job, Florida Data Center for Building A. We're going to do it as a regional benchmark job. So this would be if you saw it on the spec and it said, "Hey, Jeff, we need you to be fifteen percent below NRMCA's Southeastern Regional Benchmark," because we're in Florida "across this entire project." So Jeff would say, "All right, that sounds great." We'll click Next. And here is what he was talking about that's typically done in spreadsheets by QC managers.

24:25 · Drew Schlegel
So this is all just, usual spreadsheet math that we now have in the platform. So you can see Up top here we got all the, the applications we're gonna bid. This bottom one that doesn't have a volume yet, this is the mix that we just brought in, the one that we designed together. So if we wanna read the top one left to right, we got the name of our application, we got all the mix info, so the code, strength, the plant it's gonna come from, mix type, strength total volume that we're gonna pour, which is super, you know, important in regards to weighted average.

25:03 · Drew Schlegel
And then in the gray here, here's our GWP numbers. And then in the green here, here's the you know, project's baseline. So you can see for this first slab on grade it's not horrible, but we are only able to hit six and a, you know, 6.75% under the benchmark when we had a goal to hit 15% below the benchmark. So we know we're gonna have to make up for it on, you know, these other applications, and this honestly makes sense, right?

25:34 · Drew Schlegel
The slab might not be able to hit that, that reduction target for that specific mix. But on the footings we definitely should be able to. So let's put, you know, 100 yards in here and see what happened. So the mix we designed, again, wasn't terrible. We're at 5% you know, under the benchmark, so not horrible, but obviously this footings that I have in here above is at 25% below the benchmark.

26:01 · Drew Schlegel
I think I got a blended cement and a fly ash in this mix, so makes sense based off of the one we just designed together. So I'd say, all right, let's get rid of this one. Let's say we're gonna bid these three mixes for the slab, the column, and the footings, and then if I click next here, we can see where we landed across the entire project. So I'll take away the benchmark for a second.

26:27 · Drew Schlegel
Here's our total kilograms of CO2 equivalent, so 54,600. If we put the benchmark in, well, the benchmark wanted us to try to hit 67,900. So they wanted us to be 15% below the benchmark. Well, we're actually 20% below the benchmark target. So we have QC teams and, you know, especially sales teams, QC guy will usually hand this to the sales teams, and they're going to these you know, Amazon jobs and they're like, "Look, guys."

26:57 · Drew Schlegel
Or Chase Bank, for example, is... Bunch of times I've seen this used on Chase Bank jobs where they're like, "Look, you wanted this reduction. Here's where we're sitting. Here's where we're sitting across each application." And these project owners are just stunned every time. It's the funniest thing ever, where they're like, "Wow our ready-mix producers don't usually talk to us like this. You're gonna get this job and all the jobs moving forward," which I think Jeff and his team have definitely seen that benefit happen as well of getting, you know, jobs moving forward once they know that they can produce low carbon concrete.

27:30 · Drew Schlegel
And this is just, again, a tool to, to show those type of people that you, you can do it, and you can hit the requirements of their specification. So cool thing is if you save and download this report it'll also come with, the, EPDs for all of these applications of the job. So most people will download this report, it'll have all the EPDs attached, and they're putting it on their bids and submittals on these low carbon concrete jobs.

28:02 · Comparing same-strength mixes before choosing what to bid

28:02 · Drew Schlegel
So that's kind of all the, the new features. Obviously, we still have the dashboarding capabilities where you can do plant to plant comparisons and even mix to mix comparisons. So most people will say, "Hey, I want to filter by a specific plant. I'm looking at you know, 3,000 PSI mix designs to bid on this low carbon job. I want to compare three of the same strength class of mixes to each other and see which ones I want to bid."

28:27 · Drew Schlegel
So you can see, all right, that straight cement mix, the one I've been showing you all day, we're at a 381 GWP. This one with the blended cement and the fly ash is at a 201. So obviously you know, just depending on, on what we're looking at here, probably don't want to roll with the 381 if it's a, a Amazon data center. So again, I think that's kind of all I wanted to show you guys today and what we're envisioning is, you know, you get the spec thrown on your desk by the lazy sales guy.

28:56 · Drew Schlegel
You take that spec, put it in the spec summarizer, spits out all the applications. You might choose an application and then see you, you know, which mixes could potentially be a fit or you just design a mix to meet that spec. And then you take that mix, put it to a bid report with all the other applications that you're gonna bid and then again, give it, give it to the Amazon data center, and they go, "Wow we're gonna give you the rest of the 10 buildings and then every job in the future."

29:23 · Drew Schlegel
So that's kinda, kinda what we're envisioning here at the platform. I'll stop sharing, and then I know, Saskia, you could probably bring up the rest of the slideshows, and then we can start answering questions for Jeff as, well. So let me go, now that I'm back here, and see if there's any questions.

29:49 · How much lower was GWP with 20% Class C fly ash?

29:49 · Drew Schlegel
All right, Jeff, we got one from Dan. He goes, "Jeff, what kind of reduction in GWP are you seeing with a typical 20% SCM replacement?"

30:03 · Jeff Schaefer
Okay. So when we use 20%, we use class C ash pretty regularly around here. So if we just do a basic mix with 20% C ash in it, we'll just say a 4,000 pound mix, for example. Just, just doing that, we'll be at anywhere from 11 to 13% below the NRMCA's baseline average for 4,000 PSI concrete, depending on what plant it's coming out of.

30:30 · Which GWP benchmarks does Kienstra see in bids?

30:30 · Drew Schlegel
And Jeff, I guess to piggyback off that question Are most of those jobs, like NRMCA regional benchmarks, do they come up with their own benchmarks? Like, what are you seeing in your specific region?

30:45 · Jeff Schaefer
I would say 99% of them are the NRMCA benchmarks. The one job that wasn't was the GSA contract job that I talked about earlier, which their benchmarks aren't quite as tight as the NRMCA, so theirs are a little easier to meet with, you know, everyday mixes. But 99% of it's the NRMCA ones.

31:08 · Drew Schlegel
Got you, and I guess that's a good opportunity to plug that... I was just at, you know, NRMCA's Concrete Works, and I think Tiffany Villareal, if she's here, you know, she'd probably be able to tell you a lot more. So new regional benchmarks actually just came out. I'm sure, you know, us at Climate Earth could probably send you guys out what the new regional benchmarks look like and there's a bunch of new territories.

31:35 · Drew Schlegel
I think it's split up across 18 different territories or regions, however you want to split it up now. So that's just something to keep, keep in mind is that there's more regions now, which means those, you know, benchmarks you're gonna have to hit are gonna be different than they were, were previously. So definitely something good to note.

31:56 · How do you display the GWP reduction as a percentage?

31:56 · Drew Schlegel
Let's see. Here's another question for you, Jeff, or for me, I don't know yet. We got Mike S., "On the report, is there a way to show the GWP reduction in a percent instead of a decimal like your example was? .8 instead show..." Yep, so Jeff- or Mike, let me go back to the demo real quick. We can try to play with it in live time. Forgot it was a bid report.

32:29 · Drew Schlegel
Building A. We'll click next here, and then if I... Or hold up, let me save and download it for you. Save and download as a bid report, and also you can include the mix codes if you want on the bid report. This specific bid report, I believe, has it in percentages, so let me see here. So you see now, Jeff, all you have to do to get the percentage is... Let me click that pencil again, or I think Mike asked for this.

33:11 · Drew Schlegel
Save and download bid report. Instead of doing ACI 323, ACI 323 is the reason that it's like the, the .8, for example. If you click bid report and then click download the bid report, it'll show you it in percentage form instead. And then let me stop share. All right, yeah, Tiffany says, "NRMCA Concrete Sustainability website to download," you know, the new version of the you know, like regional benchmarks.

33:55 · Drew Schlegel
Any any other questions? Or Saskia, I don't know if you had, you know, any on your end that I can't see.

34:02 · Saskia Frowijn
No, I think we're all good on that side, and that link I'll include in the email after the webinar just so that everyone has access to it and knows where to locate it. But I think that's all on our end. Actually, I think... Yep, Mike says thank you, so I think that's it from audience questions.

34:23 · Why did the engineer ask about the pan stairs?

34:23 · Drew Schlegel
Okay, awesome. Well, Mike, any... Or sorry, Jeff, anything, you know, else to add, you know, while we have you here?

34:32 · Jeff Schaefer
No, not really. I mean, it's just really getting staying with the contractors to kind of find out the yardages for everything that, especially on these bigger jobs. Because we did a, a job or bid a job, or we're doing it now, but where the typical contractor language would be, "Hey, we got, let's say, 5,000 in footing foundation, 10,000 yards of interior, and 20,000 yards of exterior." But that doesn't get it done, because when you go to...

35:05 · Jeff Schaefer
When I had to s- in this example where I had to submit it on the spreadsheet before this was updated to where it is now, the engineer shot right back, "Where's the pan stairs? Where's this? Where's that? Where's that?" And that's how I learned real quick you have to be the squeaky wheel, and if you're not gonna look at the plans and figure it out yourself and you're relying on the contractor, they're gonna get tired of hearing from you, because they don't break it down that way until you pull it out of them.

35:34 · Who provides the yardage for each placement?

35:34 · Drew Schlegel
Jeff, I guess how often are you seeing them where they ask for, like, specific amounts, like specific yardage where it's like we need 5,000 yards of the footings, or do you ever have to go back and ask them for that so you can get the weighted average? Like, how often do you see the requirements where they ask for a specific yardage, and how often do they not even ask for that?

35:57 · Jeff Schaefer
I always ask for it, because usually I- we're the ones doing the calculations to figure out if we're gonna make it with, you know, each mix that we got to put on the job. So I always ask for it. I would encourage everybody to always ask for it, unless you want to spend a bunch of time going through the drawings and figuring it out yourself. But my theory has always been that the concrete contractor, they did the takeoff, so they should know exactly what applications and how many yards in each application.

36:30 · Jeff Schaefer
But if you don't get it, all that information, then you could have a situation like I did before where the engineer shoots right back, "Your numbers aren't right. What about this? What about that?" And then you kind of- Look have a little egg on your face when you gotta explain that you didn't have all the information.

36:50 · Are owners setting targets per mix or across the whole job?

36:50 · Drew Schlegel
Got you. And are you ever seeing mix-by-mix requirements still, or is it mostly the project level requirements? Like in your, your specific region, what have you been seeing lately?

37:05 · Jeff Schaefer
Mostly it's the project level, you know, the weighted average. There's every now and again, like Chase Bank for example, they just wanna know, you know, what it is. I mean, they have their certain mixes now that they use from us, but theirs was more of, you know, we want our footings and foundations to at least hit this, and we understand the floor slab's not. So that... Those are probably the exception to the rule.

37:30 · Jeff Schaefer
Most of them now are the weighted average, where you need every bit of information you can get, and yardage.

37:42 · Drew Schlegel
Definitely. And I, I was gonna say, honestly, that's kind of what I'm hearing and why we, you know, built that, the weighted average tool. So hopefully can help you and, you know, the rest of the people on this webinar you know, with those type of things. Let's see.

37:56 · Has Kienstra seen freeze-thaw failures in lower-carbon concrete?

37:56 · Drew Schlegel
Andrew asks, "Are you seeing low carbon concrete in failure from freeze thaw?"

38:09 · Jeff Schaefer
I have not, but, I mean, like I said, you gotta know which mixes you can back off on and which mixes you can be pretty aggressive on. But so far we haven't had any issues. And, you know, the kind of mixes we use for... That would be like a exterior concrete, are not too different than what our local DOT used to use on their bridge decks, you know, ternary mixes. So we don't, we don't get too crazy but, like I said, we don't have the issues with like hauling distances that other markets outside of here have.

38:38 · Jeff Schaefer
So our numbers are generally pretty low, and then when you just throw in extra powder or ternary mix, they really go down, so you don't have to do too much crazy stuff that could cause any issues.

38:53 · Drew Schlegel
Gotcha. Okay, anyone else with any, you know, last questions? We appreciate you throwing these into the the chat, especially since, again, I'm usually the one answering the questions and I'm like, I don't actually... You know, I'm not in your world, you know. Jeff's the one that has, you know, the, the day-to-day experience, so definitely should be asking Jeff any and every question. Let's see here. Okay. Thank you, Andrew.

39:25 · Jeff’s closing advice for producers

39:25 · Drew Schlegel
Awesome. Well, I guess, Jeff, anything, anything else you have to, to leave the audience with?

39:42 · Jeff Schaefer
No. I mean, just the... Like I said, information is key, so get all you can, 'cause on the contractor side you know, it's 50/50 if they're gonna actually know what it, what it means and, you know, what it, what it takes to get what they need.

40:01 · Drew Schlegel
Definitely. Well Jeff, again, we, we appreciate you. Appreciate, you know, having you on. Again, Jeff is, you know, on that, the new system that I just showed you, so hopefully he can start, you know, getting out of the spreadsheets and getting on some of those, you know, new tools that we hope saves a bunch of time for y'all wins you some of these more low carbon concrete jobs. Just to plug Saskia and I's other, you know, webinar series.

40:24 · Drew Schlegel
We do host a webinar series with like innovative SCMs and blended cement. So would definitely suggest you all to continue to join those because that's always interesting to see what, you know, new and innovative things are out there to throw into your, to your mixes to lower your GWP. And then I'm sure Saskia will have another webinar here soon. So again, thank you everyone for joining this webinar today. And Jeff seriously appreciate you.

40:53 · Drew Schlegel
You're one of the best in the biz in regards to QC.

40:57 · Jeff Schaefer
Oh, no problem. Anytime. Thanks guys.

41:04
All right. Thank you, Jeff.