What is a concrete EPD, and where do you find the carbon number?

An EPD is a verified report of a product’s environmental impacts. Drew calls it “your nutrition label for your concrete.” If a bid sets a carbon limit, look for global warming potential, measured in kilograms of CO₂ equivalent per declared unit, such as a cubic yard of concrete. The underlying life cycle assessment (LCA) calculates the impacts using product category rules (PCRs). In the cradle-to-gate example, A1 covers material production, A2 covers hauling those materials to the ready-mix plant, and A3 covers batching and plant operations. Delivery from the plant to the jobsite is a separate stage, A4.

When can you compare two ready-mix EPDs fairly?

Match the application, performance requirements, declared unit, and life cycle stages before comparing GWP. In the Q&A, an attendee points out that two mixes can have the same 28-day strength while only one meets an early-strength requirement. Lionel suggests comparing “two mixes that are designed for the same application on a project.” For a footing bid, check the proposed footing mixes against that spec, put both results in the same units, and confirm that the EPDs use compatible PCRs. Compare each with the regional benchmark the owner names.

What does a plant need to generate its first verified EPD?

Start with the mix design and material quantities, suppliers and haul distances, utility bills, and plant production records. QC may already have the recipe. Purchasing can identify where the materials came from, and plant operations can supply energy and production totals. The LCA team uses those records to calculate impacts and prepare draft EPDs for independent review. Drew recalls a rural Louisiana producer that went from its first EPD conversation to submitting declarations for a data center job in about a month. That was one producer’s timeline. Check the submittal date before scheduling the first pour.

Does the carbon limit apply to each mix or to the whole project?

Read the acceptance language. One specification Drew shared required a verified, product-specific EPD showing GWP at or below the applicable threshold. It also said, “EPDs must be provided minimum two weeks prior to the first concrete pour.” A second example set a whole-project goal of 30% below the Great Lakes regional benchmark. That distinction changes the bid. A fast-setting slab may need more cement, while high-volume footings may offer more room for a lower-carbon mix. For a project target, multiply each mix’s GWP by its bid volume, then compare the combined total with the benchmark for the same placements and volumes.

How much did replacing cement with slag lower GWP in the demo?

In Drew’s Orlando example, cement production accounted for 345 of the initial 402 kg CO₂e/m³. Replacing 100 pounds of cement with 100 pounds of slag lowered the modeled total to 354 kg CO₂e/m³, a reduction of about 12%. The revised mix was still 54 kg CO₂e/m³ over the example limit of 300. A QC manager can use that comparison to decide which adjustment to trial next, then check strength and placement performance. Drew restores the original recipe before publishing, so the EPD shown at the end reports 402.

How should a producer handle a supplier’s new material or imported cement?

Ask the supplier for an EPD and check whether its data can be used under the rules for your concrete EPD. Matthew explains that an LCA can help assess an emerging supplementary cementitious material (SCM) while the supplier builds the production history needed for a verified declaration. Lionel recalls a producer importing cement that asked its supplier for a North American EPD after the contractor needed upstream documentation. The supplier produced one. Bringing that question to the supplier early gives QC time to confirm which data the project will accept.

What to take back to your plant

For your next bid review, write down the placement and strength requirements, the GWP limit and units, whether the target applies per mix or across the project, and the EPD due date. With those in hand, QC can identify a mix worth testing and sales can tell the contractor exactly what the plant can document.

Talk with Climate Earth about a ready-mix EPD or a project GWP requirement.

Full Webinar Transcript

Welcome and speakers

00:02 · Saskia Frowijn
Hi, everyone, and welcome to The Future of Concrete webinar series. In this session, we are going to be covering EPD 101: All the Basics that You Need to Know. This webinar is sponsored by Climate Earth, the leading software for concrete carbon management, from EPD generation to whole project carbon reporting and workflows. Climate Earth helps producers simplify carbon-related project requirements so teams can move faster, reduce risk, lower costs, and win work. Feel free to drop questions in the chat throughout the session, and we'll cover as many as we can during the Q&A at the end.

00:39 · Saskia Frowijn
I will also send an email after this webinar with the presentation included with a replay link in case you want to take another look. With that being said, I'll hand it over to Lionel.

00:52 · Lionel Lemay
Well, thank you, Saskia, and hi, everyone, and welcome to The Future of Concrete webinar series. It's great to have you here. Today's session is focused on how EPDs, carbon requirements, and low-carbon concrete specifications are shaping the ready-mix market. We'll look at how these requirements are showing up in project specifications and procurement processes, how producers can quickly evaluate projects, and performance goals, and how EPDs and reporting workflows can help communicate mix design decisions, demonstrate compliance, and support project success.

01:26 · Lionel Lemay
As Saskia mentioned, we'll monitor the Zoom question box, so if you'd please, participate in the conversation with us. We'll save the questions till the end. We'll have about 15 minutes or so, or 20, 15, 20 minutes for questions near the end. Our speaker today is Drew Schlegel with Climate Earth. Drew works with concrete producers and project teams to help make environmental product declarations, carbon data, and low-carbon concrete requirements more practical and actionable.

02:02 · Lionel Lemay
Climate Earth provides the software and services that help concrete producers develop EPDs, manage carbon data, and respond to evolving project requirements for low-carbon concrete. With that, I'm pleased to welcome Drew Schlegel. Drew, I'll turn it over to you.

02:19 · Drew Schlegel
Hey, guys. My name is Drew. It's an absolute pleasure to be here. Again, Lionel, appreciate you having me. Again, I do want to highlight that this does say sales manager, right? And this is an EPD 101 webinar. I highlight that because we do have LCA technicians at Climate Earth, like Matt Lemay, who will be answering questions with me at the end of this call. So if you have technical questions, put those into the chat.

02:48 · Drew Schlegel
But as a sales guy, right, I didn't even know half these terms, I'd say, a year ago, which is a great thing because I can dumb it down, and make it simple and easy to understand these terms. So yeah, ask me any of the simple questions, but also throw in your more technical questions, for Matt at the end of the call. And from that, we'll get into this.

03:12 · Drew Schlegel
So again, real quick, just to highlight on Climate Earth, we generate 90% of the concrete industry's EPDs. We're in 1,400, or over 1,400 plants at this point, so, definitely know what we're doing when it comes to EPDs within the concrete industry, whether that's ready-mix, block, precast, cement. We kind of hit on the entire, concrete industry. And kind of why we're here today, right, EPDs, they've been popping up on so many projects lately.

03:47 · Drew Schlegel
Again, I think Saskia mentioned I work with a ton of ready-mix producers who have said their owners, the project architects, governments, depending on where you're at, have been asking them to measure and report on environmental impacts of their concrete. And they're like, "How the hell do I do that?" And then they call me, and I go, "Oh, EPDs is what it's called." It's an industry-standard way to provide that environmental impact information of your concrete mix.

04:19 · Drew Schlegel
And what's kind of driving all this is, again, what you see here highlighted, reducing greenhouse gas emissions from the built environment. You can see some of these numbers, right? 39% of global carbon emissions, is coming from buildings, and then 11% of that is from the building materials, and obviously concrete being one of the world's most widely used building material. If we make a small reduction in embodied carbon, it's going to be meaningful at scale.

04:52 · Drew Schlegel
So that's kind of why we're here today having this conversation.

Embodied carbon and EPD basics

04:57 · Drew Schlegel
So let's start breaking it down here. So what is embodied carbon? So embodied carbon is what I just said, the greenhouse gas emissions associated with producing a material from raw material extraction through the manufacturing process. So let's just think ready-mix concrete and what goes into ready-mix concrete. So you got big rocks and you got small rocks. Where do those rocks come from, right? A big old quarry. At that quarry you got the big rocks.

05:30 · Drew Schlegel
You know, you put it onto a belt, put it into a crusher, and it makes smaller rocks, right? That's all a raw material extraction process. Same thing with cement. Put it into the rotary kiln, right, and eventually it turns into a powder. After those raw materials, right, get into their form, their final form, and are extracted, they got to go somewhere, right? They got to get put onto a truck to get to your ready-mix concrete plant.

05:56 · Drew Schlegel
You know, we got customers that might barge over cement, so the cement's actually put on a ship, and then it's at a terminal, and then it gets put on a train, and then a truck picks it up from there. All of that factors into embodied carbon, and then the final piece, being the manufacturing, at your plant. So this, and we'll touch on it a bit later, is called A1 through A3.

06:21 · Drew Schlegel
You know, being A1 raw materials and extraction, A2 being kind of the transportation of those raw materials, and then A3 being the actual batching of the concrete at your plant. That's kind of what embodied carbon is. And then if you look at this, I do want to highlight that cement dominates the majority of concrete's embodied carbon. As you can see, it accounts for seventy to ninety percent of the total GWP, just depending on the mix design.

06:56 · Drew Schlegel
And if you don't know what GWP is, don't worry, we'll get into that a bit later. But that's what embodied carbon is. I guess why it matters, it's just popping up, right? It's popping up, whether this is in LEED jobs, LEED version five is requiring this. Any private jobs, like big Amazon jobs, which again, we'll get into that a bit later, but so big private jobs, states are regulating it.

07:25 · Drew Schlegel
It's just becoming a huge thing, all throughout the country and all throughout the world, when it comes to these type of projects. So now we got to get into some acronyms. Especially when I'm working with our ready-mixed producers, people usually don't like acronyms. These were the four that we came out with that I'm like, "Hey, they got to know this. If we're doing EPD 101, they’ve got to know these four."

07:55 · Drew Schlegel
So first, LCA. I mentioned we got the world's best LCA specialist, Matthew Lemay being one of them. Well, what is an LCA? An LCA is a life cycle assessment. It's a standardized method for quantifying those environmental impacts of a product across its life cycle. So again, for the ready-mixed concrete EPDs that are generated, the assessment is from cradle to gate, so A1 to A3. Again, that raw material extraction, the transportation, and then the manufacturing.

08:30 · Drew Schlegel
A bunch of comments I usually get on these calls are people saying, "Drew, why is it only to my gate? Why aren't we accounting for anything after the gate?" And at first, I had no clue. I was like, "Huh, that's a great question." And I go, "Oh, it's because of PCRs, which is product category rules." This is the rule book that actually defines how to perform a life cycle assessment.

08:56 · Drew Schlegel
And how to write the EPD for the given product type. Again, if we're just reading this, PCRs standardize the scope, boundaries, and units, so these results are calculated consistently and can be fairly compared across producers. So these PCRs are honestly great because without them, it wouldn't be comparable, right? This wouldn't even matter because you couldn't compare one producer to another producer. So the these PCRs are great.

09:27 · Drew Schlegel
These PCRs are what's dictating it being A1 to A3. So if you ever have a question, don't ask the sales guy, right, at Climate Earth. Maybe ask some of our LCA people who sit on those PCR, boards. Now getting into EPD and GWP, I'd say this is honestly more important than knowing these top two, in my opinion. That's because this is what's actually being asked for on jobs.

09:57 · Drew Schlegel
So whether you're a ready-mix producer, whether you're a structural engineer you work for a general contractor, I would definitely tell you to learn and know about EPD and GWP. Quick example that just came to my mind, actually. I was having a conversation with big one of the biggest GCs up in Canada recently, and they're going to start speccing EPDs on all their jobs.

10:26 · Drew Schlegel
The only interesting thing was they're like, "Drew, we got no clue how concrete producers actually generate an EPD. Like, we're asking for it on our jobs, but can you show us how they actually do this, go through this process, what they do to get set up, how they actually generate an EPD?" 'Cause they had no clue. So I'm like, "Sure, let's do it."

10:52 · Drew Schlegel
So I think that's also why this webinar came to be, 'cause after I get through all these slides, I'll also show you, one part of our software where we'll generate, an EPD together. So hopefully that'll clarify things for people that aren't ready-mix producers, right? The people that are the engineers, the architects, project owners, GCs of the world. But to get back into it, so EPD, you've heard it before, it's your nutrition label for your concrete.

11:23 · Drew Schlegel
Standardized third-party verified report. I'll get more into that in this next slide. The GWP is what I like to call the calories portion of your nutrition label. So when you got that nutrition label of that big piece of chocolate cake, and it says a thousand calories, you're looking at the calories portion, right? That's what matters when you're comparing it cake to cake. That's GWP in concrete mixes, right?

11:48 · Drew Schlegel
If you're looking at the GWP score, that's what actually matters. That's what's being specified on these jobs, and GWP is simply the measure of a product's contribution to climate change, in simple words. It's the primary metric that's being reported on these concrete EPDs, commonly referred to as the product's carbon footprint. So again, kind of just to get more into what an EPD actually is.

12:19 · Drew Schlegel
So on our right side, this is what an EPD looks like. Again, this is a third-party verified report. Think of it as a nutrition label for the concrete. It's got product information on it. So you you can see we got a 5,000 psi mix design here. Declared unit is important. So we got one cubic meter of concrete, and then one cubic yard is kind of in these parentheses or quotations.

12:51 · Drew Schlegel
You know, PCR and LCA scope is also on this EPD. So that's kind of just the basics of what an EPD looks like, what's actually on this, the plant that it's coming from, and the specific mix, that this EPD is for. And again, we'll generate one of these together, through our software at the end of this call.

Reading and comparing concrete EPDs

13:17 · Drew Schlegel
And yeah, if you want to just get into how to read a concrete EPD, you definitely want to look at that declared product and unit at first. I'd say this is one of the biggest mistakes I see people making. Some specs say, "Hey, we need this in cubic yards." Others say they need it in meters. And the score is going to be a lot different based off this.

13:42 · Drew Schlegel
So just keep in mind, like, when you're comparing two EPDs to each other, you want to look at the declared product unit. And again, just to go back, it says it right here when you're looking at an EPD. Scope and system boundary, again, this is just when I talk about the cradle-to-gate aspect of it. You just want to make sure it's A1 to A3. Some are starting to require A4.

14:07 · Drew Schlegel
I don't see it super common lately. I know they just added that to one of the new PCRs. But A1 to A3 is kind of what your bread and butter is right now. GWP, we've obviously talked about, and then EPD dates. So these EPDs, once you generate them, they're valid for five years, so keep that in mind as well. And yeah, like we were saying, I think I was comparing chocolate cake to chocolate cake.

14:40 · Drew Schlegel
You definitely want to make sure you're comparing EPDs, apples to apples, I guess. You know, we used a healthier example on the slides, but I'm a big dessert guy, so I used chocolate cake. But anyway again, EPDs, they got to be under the same PCR, so they're both being judged A1 to A3. They both got to be judged in cubic yards, for example. And then I guess this is an important thing to highlight as well, is product-specific versus industry-average EPDs.

15:15 · Drew Schlegel
Product-specific is going to be way more accurate, and specific to your plant, specific to that exact concrete mix than if you use an industry-average EPD. So definitely think that's important to highlight. As well as, I think I was mentioning, right, you got to compare 4,000 psi mix design to 4,000 psi mix design. If you're looking at a 5,000 psi mix and a 3,000 psi mix, it's not going to be apples to apples, right?

15:43 · Drew Schlegel
Those scores are obviously, going to be different. And then the regionality comes into play, right? The different SCMs you use come into play. So keep all of that in mind when comparing in one EPD to another.

Plant data and third-party verification

16:02 · Drew Schlegel
So real quick how an EPD is actually created. So again, you would say, "Hey, this is going to be for a ready-mix concrete plant, so we're going to fall under the ready-mix PCR rules." We got to collect data, right? So that's what Matt Lemay and our team does. They'll want to collect all that raw materials data. They'll want to collect your supplier's information, so the suppliers of those raw materials, so we can calculate the transport distances.

16:31 · Drew Schlegel
And then we just got to collect utilities, bills, production data, that sort of a thing. So you got to do data collection. Then our team internally performs that life cycle assessment that we talked about, where you're actually calculating all of these environmental impacts of each one of those raw materials. And then we'll eventually create a couple draft EPDs for you, send it off to third-party verifiers.

16:58 · Drew Schlegel
They'll give us the checkbox, send it back, and then you're usually good to go, when it comes to generating EPDs from there. So people are typically scared of this process. Honestly, it used to take a ton of time, probably up to three months to four months at some points. I'd say it's probably about a month at this point from beginning data collection to verified, just to give you ballpark numbers.

17:31 · Drew Schlegel
So I've been talking about third-party verification a lot. Just wanted to highlight kind of why we do this and why it's important to get that LCA third-party verified so that you can have third-party verified EPDs. So as you can see in the writing, EPD's got to be signed off by one of these third-party verifiers. You know, manufacturers can't self-publish unchecked numbers. Verification requirement is kind of what gives EPDs their credibility, right?

18:03 · Drew Schlegel
So again, if you were able to self-verify, there would be no point because people would just make up different numbers. These are just some of the verifiers and what's called a program operator. So NRMCA, ASTM, those are kind of common ones. And I guess kind of highlighting on why ready-mix concrete specifically is unique, it's 'cause you got thousands of mix designs, right?

18:35 · Drew Schlegel
Like, each one of those raw materials and the changes in each one of those mix designs, it is going to change and factor into your overall score, as you can see, right? Like, where your cement plant. If you're getting it, like I mentioned, the one person that gets it from Turkey and the one person that gets it from their backyard in Midlothian, those scores are going to be pretty different.

19:01 · Drew Schlegel
The energy grid factors into this. Transport distances, right? Again, with it being shipped from Turkey instead of just trucked. The volumetric versus plant mix. All of this is going to factor in, to your overall GWP score. And again, it's what makes concrete so unique, just 'cause there's so many different variables at play within one mix design, let alone the 20,000 that a concrete producer might have.

19:35 · Drew Schlegel
Kinda getting into what's driving all of this, in the US, I mean, there's buy clean states, right? California, Oregon, Maryland. I've gotten a ton of calls from Minnesota lately because their DOT and a bunch of jobs with the Minnesota DOT are now requiring EPDs. So this could be DOTs. This could be your buy clean states. This could be your LEED jobs, right? These are all the types of jobs that are requiring, what we call a low-carbon concrete job or EPDs on the job.

20:17 · Drew Schlegel
So it's definitely being driven, at a regulatory level and the private side as well. Not everyone here is from the US, and it's not like I know the exact specifics, but it's happening all over in Canada, right? We work with a ton of Canadian ready-mix producers, as well as aggregate quarries, cement producers. It's always been big in Canada.

20:46 · Drew Schlegel
You know, BC, low-carbon concrete requirements, Ontario, Toronto all got some type of requirement, as well as Europe, with that digital product passport. Again, I'm sure one of our more technical team members could highlight on this, 'cause we got a big team in Europe. But digital product passports, all of this environmental data, is going to be required on jobs in Europe as well. So we just wanted to highlight, like, these requirements only, aren't only in the US.

21:15 · Drew Schlegel
This is popping up in Canada and all across Europe as well. And you know, this ain't just at the government level, right? I'd say a major driver is the private side. So easiest answer, because it's just, it's popping lately, is the data centers, right? It's all you see in the news. It's all you hear about. You know, I'm a big Twitter guy, it's all I read about on Twitter, and LinkedIn is, "Oh, a new data center popped up."

21:44 · Drew Schlegel
That's what I get calls about every single day, 'cause these hyperscalers, right? I think we got AWS mentioned. Amazon requires it on all jobs, you know. You think Metas of the world, you think Googles of the world. Typically, they’ve had EPDs required on the spec, right? Driving a lot of the demand. Sometimes, and I'll be honest with you they might not actually enforce it.

22:16 · Drew Schlegel
I'd say within the last two months, I've had people come to me that are mid-pour that are like, "Drew, we just got hit up. We got to produce EPDs right now, and we've already been pouring concrete," and they want it to be at a reduction, according to a benchmark. And they have no clue what to do because they've just been familiar with, "Oh, maybe we have to produce an EPD, and that's about it.

22:40 · Drew Schlegel
Maybe we got to hand them that piece of paper, and that's it," where that's definitely not the case anymore. So did want to highlight that, but seeing EPDs obviously in the data centers, again, sticking on Amazon, obviously a lot of warehouse and distribution centers, any type of semiconductor fab facility, and then public infrastructure, university jobs, school jobs. Chase Banks is another huge one. That's a smaller scale job but pops up in basically every city, that has EPD requirements on the private side of things.

23:18 · Drew Schlegel
And this is, it's kind of perfect that this is the next slide, and this is kind of I'll show you in these next two where GWP is popping up on a project basis as well as how EPDs actually show up in a specification.

Reading EPD requirements in a bid

23:35 · Drew Schlegel
So this is pulled directly from a spec. It says, "Environmental product declarations," and it says, "Submit third-party verified product-specific Type III EPDs for each of the following products and materials. The EPD must show that the global warming potential, GWP," calories, which we know now, "of the material or product is less than or equal to the applicable GWP threshold," da. So you can see they're asking for Type III product-specific EPDs.

24:07 · Drew Schlegel
I think if we go to this next box, something that's interesting is this one has, "EPDs must be provided minimum two weeks prior to the first concrete pour," which is actually a pretty decent standard. You'd rather that than have to do it mid-pour. But this is what we're seeing pop up a ton lately. To win this work, to actually be able to bid these jobs with carbon requirements you're going to need to be set up with EPDs.

24:37 · Drew Schlegel
It's no longer, a thing where you can not have EPDs and then kind of go and get them set up afterwards, 'cause you're just not going to win the job. So definitely wanted to highlight this. I think this is one of the specs we got from one of my customers that sent it to us. GWP. So I definitely wanted to highlight how GWP and project level reductions have been showing up, in specs.

25:08 · Drew Schlegel
So again, just so we're on the same page, GWP is measuring the embodied carbon of a concrete mix. It's reported in kilograms of CO₂, and it's in either yards or meters. Remember, we got to make sure it's either in yards or meters. So I can zoom in real quick on this. So this specific job, right, had embodied carbon footprint goals. So we'll just read through it. "This project has a goal of reducing the embodied carbon footprint relative to a benchmark or typical project.

25:48 · Drew Schlegel
To accomplish this goal, the target embodied carbon footprint reduction is 30% below, the Great Lakes Region benchmark." I wanted to show you guys this because this type of specification has been spreading like wildfire. This is based off of ACI 323, and again, it's at the project level, which honestly is a good thing for y'all. We like seeing carbon reductions at the project level because it gives you room to for at least the concrete producer, to get to that reduction.

26:28 · Drew Schlegel
For example, if you said, "I want a 30% reduction on every single mix," well for the slab, for example, you might need that to set faster. You might have to use more cement in that mix. So that's not going to be realistic, right? That might be a little bit over the benchmark. But the footings that we're also going to pour on the same job, which is a ton of the volume of the job, we could pump a super low-carbon mix in and get that project level reduction, down to a 40% reduction, even though our slab is a little bit over.

27:08 · Drew Schlegel
So I think I love the way the industry is taking this, where they're specifying it on the project level, because it just gives you more room, to work with things and be able to get to that reduction, instead of being super prescriptive and unrealistic, I'd say. So I just wanted to highlight, like, this percentage below an NRMCA regional benchmark, I see popping up a ton.

27:35 · Drew Schlegel
And not to be a complete sales guy, but we do have a tool that does all this in the Climate Earth software. Let me click next here. All right. So what ready-mix producers should do now, obviously get organized. You are going to have to do data collection with us. Just just get it organized. Most people have this readily available in their QC systems.

28:05 · Drew Schlegel
So again, not super complicated. Generating an EPD, right? Like, actually walking through that process, working with someone like Climate Earth, obviously going to be super helpful to be prepared for when you see it pop up on these jobs. Optimizing mixes, again, I'd-- that's spreading like wildfire, where you're going to have to start hitting reductions. But again, you don't want to just have the lowest GWP number that's not going to perform well, right?

28:35 · Drew Schlegel
So you need to start optimizing your mixes, so that you can balance those trade-offs that's going to come with trying to lower your GWP number. And then, yeah, like, the last thing is just staying up to date on everything that's going on, whether that's the new LEED updates or PCRs changing, because those product category rules that govern all this, they do change, right?

29:01 · Drew Schlegel
There's new ones coming out all the time. So it's definitely good to stay up to date. And again, guys like Matthew Lemay can definitely help out with that side of things. So just a quick kind of recap before I get into a quick demo, which I think will be super helpful to y'all on how to generate an EPD. So one EPDs, they enable transparency, right?

29:28 · Drew Schlegel
Industry standard to actually report the environmental impacts of concrete. They're based on a life cycle assessment, and provide consistent third-party verified data that customers can compare two and two together, apples to apples, chocolate cake. Why now? I think as you've seen, whether it's the public side, whether it's the private side, there's a ton of jobs with these requirements on them. So yeah, that's why now.

30:01 · Drew Schlegel
Focusing on the GWP, we've already mentioned a bunch, but being able to reduce that number while maintaining performance is going to be super important. And then again, just to keep plugging Climate Earth here, baby you got to get set up with some type of EPD program so you're able to generate these EPDs on a consistent basis.

Orlando mix and EPD generator demo

30:26 · Drew Schlegel
So let me get into the demo portion before we go through those last bit of slides. So yeah, this is the Climate Earth platform. We got a whole bunch of other features, but this is just kind of our core bread and butter EPD generator. So you could either click New EPD. Today, I'm going to show you an existing mix. So I'm going to say, all right, we're going into our Orlando plant, and we're going to click into our bread and butter 3,000 psi mix design, and I'm going to click Edit.

31:01 · Drew Schlegel
And again, this is kind of what I showed that GC up in Canada. This is the workflow that a ready-mix producer will go through, to produce an EPD. So on our next page, we got our plant, our mix code, our mix description strength, curing days. We'll click Next. So here's where it gets real fun. So in this dropdown menu, we got all your different raw materials, that data collection piece I was talking about, where we got to say "Tell us about the big rocks you use.

31:35 · Drew Schlegel
Tell us about the little rocks you use. Tell us about your cement, your SCMs." Every raw material, that you use or could potentially use is going to be already collected and in our software platform, right? So here's all the different materials in our bread and butter 3,000 psi mix. You then see we got all of our quantities of these raw materials. And then the cool thing about our software is that it is broken down by A1, A2, and A3.

32:07 · Drew Schlegel
And if you remember, A1 is that raw material extraction piece of it. And you can see our total GWP, right, is 402. Well, 345 of that is coming from where? You know, if you were paying any attention at first, it's coming from that cement, right? So as we've said, you can tell how much of it is coming from this A1 portion of the cement.

32:33 · Drew Schlegel
You can see where the impacts are for every other one of these materials. You can see the A2, the transport, and how it affects this overall GWP score. And then we got our A3 score here as well. Another thing I wanted to highlight, in how producers do this, like, let's say you had a limit where for this specific mix, you had to hit a, 300.

32:59 · Drew Schlegel
You might say, "All right. What if we took out a hundred pounds of cement, and we added in let's do a slag, and then supplement that with a hundred pounds?" We're down to 354, right? So you can see our cement one, two cement went down to 287. You know, our slag, brought us to 354 total, so a lot, better.

33:25 · Drew Schlegel
I know it's not at 300, but it's better than that four hundred originally. This is more so just to highlight, like, you can bring in different materials, and then play with the quantities, and then in real time, you can see how your GWP score is being affected. And this is what concrete producers are truly doing every day, in our software platform when they see these requirements on the specs, right?

33:51 · Drew Schlegel
This is the first thing they do. They see, all right, this footings mix for this 4,000 psi mix has this requirement. Let's see where my bread and butter 4,000 psi mix, actually sits. So let's take out that slag, go back to the original mix that I had. From here, and I guess you can also see all this in chart form, if you'd like, we'd click Next.

34:22 · Drew Schlegel
You can see our global warming potential is at 402. Again, this is meters, right? So you'll need to look if it's being required in yards. We also have the cubic yards. All you would do is click Submit and Publish an EPD, and then once this downloads, I'll show you what one actually looks like, which we looked at on the slide earlier. So from here, again, concrete producer entered their raw materials, for their 4,000—or I guess this was a 3,000 psi mix.

35:02 · Drew Schlegel
Click Submit and Publish an EPD, and now they got their EPD, right? So we see our declared product, we see our mix, the plant that this is coming from. We see our declared unit, which we know is important. We see our calories, baby, 402. Again, this is what everyone's actually looking for. You can see the plant that it's coming from. Also has, like, program operator information, date of issue, which is important, right?

35:31 · Drew Schlegel
Because again, like we said, these lasted for last for five years. You also have a bunch of other impacts. I do want to highlight that. I'm not smart enough to tell you what each one of these impacts means, but our LCA team would be. But again, this global warming potential, at least with the people I work with day to day, is what everyone cares about and what's being specified on these, projects, lately.

36:00 · Drew Schlegel
So let's click out of that, and go back into present mode. I guess I'll just finish out just kind of telling you, a little bit more about Climate Earth, right? So what we're trying to get you to move faster from spec to submittal. We got a sweet new, I think, where is it? We got a spec summarizer, right, where reviews an entire spec, within fifteen seconds, pulls out all the concrete related applications.

36:28 · Drew Schlegel
People are taking that and then dropping in, dropping it into our mix designer module, where they'll design low-carbon mixes to meet those specifications with the forty percent reduction according to a regional benchmark. And then obviously, right, we got, our EPDs, we got bid reports at the project level, which are pretty interesting. So, if anyone is interested in being able to generate EPDs, the spec summarizer, really anything when it comes to low-carbon concrete, Climate Earth can definitely help.

37:09 · Drew Schlegel
And with that, I think we're going to give it back to Lionel. I'm sure, and I hope there's simple questions for me and hard questions for Matt would be great. But happy to answer any questions, Lionel.

Audience questions and answers

37:25 · Lionel Lemay
Well, thank you, Drew. Let's get into some of the questions. We have some great questions from the audience. We also sort of developed some seed questions, but I think we're going to go right to the audience questions because there are quite a few of them, and we'll go back to the seed questions if there’s time for that. But before I do that, I do want to welcome Matthew.

37:45 · Lionel Lemay
Matthew helps producers implement EPD workflows and brings practical experience from his prior work leading EPDs, responsible sourcing and disclosure programs at NRMCA. He, along with Drew, will, try to answer many of the questions here today. So, the first one is kind of related to one of the seed questions that we had, which is a lot of people, a lot of concrete producers know about EPDs because they've been involved for a long time.

38:17 · Lionel Lemay
But you mentioned a lot of the data centers and other technology related construction. That's being built in some remote areas where concrete producers maybe haven't had to consider, producing EPDs. So, you mentioned a little bit about the time that it takes to produce EPDs, and there are a couple of questions related to that, yeah, from the audience. So two things. You know, how long would it take for a concrete producer to familiarize themselves, one, with engaging with you as a company and their, your software, and then going through the process of producing EPDs?

39:07 · Drew Schlegel
Yeah, no, I mean, thanks for the easy one off the bat, Lionel. The first thing that popped into my head was when we were working with a rural producer in Louisiana. I think many of you know there's big data centers going up in that corner of Louisiana, and Louisiana typically isn't the state you think of when you think of sustainability. So, they knew nothing.

39:31 · Drew Schlegel
They didn't know any of these acronyms that y'all now know. And it took, I'd say, a month total to get them from not knowing what an EPD was to being able to generate EPDs and submit those EPDs on that job. Again, usually takes about a week or two for the ready-mix concrete producer to actually collect the data. Takes us about, I'd say depending on how fast Matt is over there I'd say two to four days to actually run the life cycle assessment.

40:03 · Drew Schlegel
We send it off to third-party verification, and at that point, takes a max of two weeks from that. So I'd say comfortably a month. I will say, and maybe this is insider info that I'm not supposed to tell you, but I will tell you anyway. Certain projects, like if you're desperate, right, they're like, "Hey, we need these EPDs right away," we can create draft EPDs simultaneously while we're doing all that data collection, and the draft EPD typically makes them happy while we're finishing up the process.

40:38 · Drew Schlegel
So I do want to let you know, that's the honest truth that, sometimes projects do come mid-pour, and they're like, "We need this tomorrow," and that's not going to be possible. But I'd say, two weeks, we've been able to do it, for people as well. So that's kind of honest answer, Lionel.

40:59 · Lionel Lemay
Okay. This is a follow-up, and I think it's a little more difficult, so I'm going to go with Matthew. There we go. And there's a follow-up on that too. Let's answer the first one first, which is very basic question. You mentioned, Drew, Type III EPD, a couple of times, and the question is really what is a Type III EPD? And Matthew, you can answer that with the fact that there’s a brand new ISO 14025 specification that kind of does away with that terminology, but go ahead and give your best shot at describing that.

41:42 · Matthew Lemay
Yeah. So I'm glad you mentioned that because that terminology is going to be changing, but ISO 14025 is kind of the governing core standard that defines what not only EPDs are but other types of environmental declarations are. And those types are numbered. And so I believe a Type I would not be a verified declaration, but it would be like a self-declared, environmental claim, right? So Type III, all EPDs that are full-blown, proper, finalized, verified EPDs are Type III EPDs.

Editor’s note on terminology. ISO formerly used “Type II” for self-declared environmental claims. “Type III” is the designation used in the project specification Drew shared. ISO’s guide to environmental labels

42:16 · Matthew Lemay
Essentially, Type III specifies that it had been verified by a third party. So you're going to find that language quite a lot in specifications are going to ask for a verified Type III EPD, which is almost a redundant term, right? Because in order to be a Type III EPD, it must be verified. You're also going to find that in legislation as well. They're going to specify the type.

42:43 · Lionel Lemay
All right. So, you mentioned it on a slide, Drew, but what kinds of companies do third party, the verification part?

42:55 · Drew Schlegel
Yeah, I think, Matt, you might be able to help out with this. So as far as I know, ASTM, NRMCA, Kiwa. Matt, do you have any other additional ones? I know there's a few.

43:12 · Matthew Lemay
There's one called Smart EPD.

43:15 · Panelist
Yeah.

43:16 · Matthew Lemay
Which works mainly in materials that go into concrete, everything from supplementary cementitious materials to innovative cements and those kind of materials. Yeah, the big ones are ASTM, NRMCA, Kiwa.

43:36 · Lionel Lemay
And I would say that when you do engage with Climate Earth, and the software, you guys help with identifying which companies would do the third party verification of your EPDs, right?

43:51 · Panelist
Absolutely. We do that match up. We handle basically the entire pipeline of bringing those to verification.

44:01 · Lionel Lemay
All right. So, there's a question about innovative products that sometimes they don't yet have the environmental data needed to incorporate, to be incorporated into EPDs. How is that handled?

44:23 · Drew Schlegel
Yeah, I was going to say, I think I'll fall back on Matt to get a little bit more technical, but you know, these days I'm working with people that are putting recycled, like windmills and trying to make that into an SCM. I've been dealing with a bunch of SCMs like that, Lionel. I know that me and the LCA team, it's hard because you need that certain amount of production data to actually generate an EPD.

44:55 · Drew Schlegel
We can still run the life cycle assessment for them, and it wouldn't be a Type III EPD, but it's sort of kind of like a draft version until they have enough production to get there. But Matt, I'm going to fall back on you to get a little bit more technical, but I know, that I work with innovative material companies every week. So it's definitely something we do.

45:20 · Drew Schlegel
You're on mute, Matt.

45:21 · Matthew Lemay
Yeah, absolutely. Thank you. Good catch, Drew. Absolutely. I think that it's hard to summarize how many different types of materials can be made into SCMs, a lot of recycled materials. Really, there's a hurdle in between creating one of those materials, using them in concrete, and then allowing concrete to take credit for the carbon savings that come from that material, is really one of the hurdles that we have to cross, and that hurdle is really crossed by the innovative SCM getting their own EPD, right?

45:59 · Matthew Lemay
And so, yeah, there needs to be a certain amount of time, usually a year of production data, and the work on it, which is going to be a little more complex than the work on creating a ready-mix EPD. Once that exists, all the ready-mix concrete that uses that material will be able to incorporate its impacts directly that have been published, and that's where you really see the impact.

46:22 · Matthew Lemay
It's still, an emerging field of materials, but yeah, we see new stuff every day.

46:30 · Lionel Lemay
Yeah, I would just add a comment there too, is because I do interface with quite a few organizations that are developing innovative products. And I will say this, that they all know that eventually they'll either have to produce an LCA or eventually an EPD, because that's just the nature of what, they do. They're producing their innovative material not only to specifically address a specific performance requirement, but oftentimes it is specifically to help reduce, global warming potential and other impacts.

47:07 · Lionel Lemay
So, but also I think, as Matthew mentioned, that, there are ways. The whole LCA science is pretty good about, substituting processes. The process of producing a material is really well understood in the LCA science. So long as you have some pretty detailed manufacturing processes already identified, then, the LCA experts at Climate Earth can, develop an LCA, for those companies, even though it may not be ready for prime time, EPD.

47:55 · Lionel Lemay
One there's typically not a PCR available because it might be outside the category where a PCR exists, and so forth. So, but the LCA experts and the LCA science is such that usually you can develop a really good set of environmental impacts, including GWP, from that, information.

48:20 · Drew Schlegel
I was going to say, Lionel, just to double click on that last comment you made, I just want to make sure everyone heard that. Following the correct PCR is super important, and as you said, sometimes for certain materials, there's not even a PCR. It just caught my eye because I was working with a guy where we were like, "Does this fall under X PCR or X PCR?"

48:45 · Drew Schlegel
And we were trying to figure out the processes and kind of which PCR to put it under, so that we could actually run that study. If you have an innovative material like that, you definitely want to look into the PCRs and see which PCR you'd fall under. 'cause that's definitely something that I've come across personally.

49:08 · Lionel Lemay
So this next question is for Matthew. Have you seen cases where EN 15804 plus A2 cement EPDs with additional TRACI v2.1 results were accepted as upstream data in US concrete EPDs, or is ISO 21930 always required?

49:35 · Matthew Lemay
I am going to have to partially punt on that question because personally, in my time working with Climate Earth, I have not seen that. However, I'm not going to say outright that it wouldn't be usable, as an upstream data point for an ISO 21930-based ready-mix EPD. We're fairly flexible in that regard, and basically it depends on the level of granularity, offered in that initial EPD.

50:10 · Matthew Lemay
Have I seen it personally happen? No, but only giving that as a not yet answer, in that I think it would be possible.

50:19 · Lionel Lemay
I also want to add a comment there. Matthew, I can't remember if you were involved in this discussion when we were both at NRMCA, but there was a concrete producer who was importing cement. And that cement, did have a European-based, EPD. In this case the customer, a general contractor, would have required upstream, sources, for cement.

50:58 · Lionel Lemay
And, the concrete producer then asked their cement supplier if they would produce an EPD under the North American cement rules, and they did so. They were used to the process of going through, producing an EPD, and they were, they went through the process of doing that. So I think with an ask, if you're importing cement, asking your producer to do that likely is not a heavy lift.

51:36 · Matthew Lemay
It isn't always because the real core difference between EN 15804 and ISO 21930 is really just slight differences in scope, and in the methodology. The additional TRACI, results were in that question could make the difference. But oftentimes, it's really going to depend on the granularity there. If, like you said, oftentimes a producer that's experienced with creating an EN based EPD can flip it around to an ISO based EPD, without too much trouble.

52:13 · Lionel Lemay
So the next one—

52:14 · Panelist
Especially if they're from a cement exporting market that exports to both Europe and North America, right?

52:24 · Panelist
Yeah.

52:25 · Lionel Lemay
Well, thanks Matthew. This next one is more of a comment and you covered this quite a bit, Drew, in your presentation. But the comment is really about comparing EPDs, and it pointed out that even at the same 28-day strength, some mixes on a project require higher early strength or other, parameters that would differentiate it from, another mix that was also at the same strength, but would not necessarily be comparable.

53:00 · Lionel Lemay
And I think that's a really good point. The comparison should happen when you really know that you're comparing two mixes that are designed for the same application on a project. And this is the problem with some of the sites that do try to collect information and provide averages. Building Transparency is one of them. And sometimes you're putting all those mixed designs that have the same strength, required strength into one basket, and they're not necessarily comparable.

53:46 · Lionel Lemay
But so you just have to be careful. If you're working on a project where you know you have two different mixes with the same application from different companies, yeah, the comparison probably makes, more sense. Not probably, it does. So this is a question. Can you verify all your own materials and sources and then produce your own EPD?

54:16 · Matthew Lemay
I’d go with technically yes, but it would be extremely labor intensive to do so. Part of the reason is that most materials do not have their own EPDs published, and so we rely on secondary data sources, which are in, various databases specified by the PCR, the product category rule. Not all of those databases are open access, so you would be paying for access to those databases. And secondly, they're not easy to use either.

54:46 · Matthew Lemay
So using a streamlined, purpose-built tool like Climate Earth, which has already incorporated all of those and is able to calculate them for you, is, Significantly easier to the point that I doubt that more than 1% of EPDs out there in building materials are self-produced without a purpose-built tool.

55:13 · Lionel Lemay
There's a question here about volumetric concrete mixers, and I can't remember the PCR and how it handles that. Do you remember, Matthew?

55:23 · Matthew Lemay
Yeah. So there's a brand new ready-mix PCR, which has changed some of the rules of scoping on how EPDs are produced. Like you said, it's so brand new that I'm not familiar with it yet. We have not yet produced an EPD to that standard because it's not even operative. But it is published. I believe volumetric mixer EPDs in the future under this PCR may be allowed to exclude transportation between a loading yard and then the site as out of scope.

55:57 · Matthew Lemay
The reason is this would usually fall into a part of the scope diagram for all EPDs called A4, which is transportation to the construction site. This is the equivalent of a mixer driving to the construction site. As you can imagine, that means that every load of the same mix could end up with a different GWP impact if that was included. Part of that is just a logistical concern why that's excluded from ready-mix.

56:20 · Matthew Lemay
For a volumetric mixer, they would have to take account for that distance. Under the new PCR, I believe that segment of transportation between loading and the site is allowed to be excluded because it would be equivalent to A4 for a non-volumetric mixer.

56:39 · Lionel Lemay
Thank you. We talked a little bit about this before, but obviously there's a lot of questions about this. How can a supplier of an innovative material, and there's another question about biochar as an example of that, best position to support ready-mix producers' needs for EPD data?

57:12 · Drew Schlegel
I mean, yeah, Matt, you can take this after me. I guess the initial honest feedback, from a sales perspective is like, look, it's becoming more competitive to get a lower GWP number on the job, right? So ready-mix producers are like, "If this new innovative material don't help my GWP number out, like, I ain't using it." Don't make sense, right? Like, obviously it has to perform well and the like.

57:40 · Drew Schlegel
But just from a straight GWP perspective, I'd say you definitely want to be able to sell it to ready-mix producers as, "Hey, this is going to lower your GWP score." So I think that just from a sales perspective is what I got.

57:53 · Matthew Lemay
Yeah. Just to piggyback off that, there's kind of two other factors I would consider, and that's cost and supply, for those. Those are two things that fluctuate, obviously very closely tied together, that fluctuate fairly significantly for both fly ash and slag, right, which are kind of the conventional SCMs. Both fly ash and slag have a very low environmental impact to produce because they're the waste product of another process. So you can consider them to be almost zero impact, right?

58:23 · Matthew Lemay
Which means that you're getting carbon back for every pound of cement you replace when you use fly ash or slag. One, I would say that an SCM, in order to be viable, should be very close to that in terms of low impact. You can look for industry average, EPDs for slag and for fly ash to see what a good low impact is for those materials. Second, if an SCM, a new SCM could be more cost effective or more available in a certain area where fly ash and slag is in short supply, that is going to be very important to ready-mix producers who might be able to produce a very low carbon mix at a reasonable cost when there's fly ash on the market to buy.

59:07 · Matthew Lemay
And then they have another job the next year that says, "Oh, you did low carbon before. Can you meet this target again?" But let's say the price of fly ash is very high, or they have to import it from further, which will then add to their environmental impact, right? If another SCM is available in that market to make up the difference, and can achieve similar results, it's going to sell very well if it's going to low-carbon jobs, in that area.

59:33 · Lionel Lemay
Well, thank you. Actually, we're coming to the end of the webinar hour. So, I just want to add one thing to that, and that is these innovative materials, there's no one silver bullet in developing low-carbon concrete, and most low-carbon concretes have a number of solutions, admixtures, SCMs, and other innovative materials to get the carbon footprint down or address a specific performance requirement.

60:06 · Lionel Lemay
So I would say for those innovative material suppliers do some research around the compatibility with other solutions because they are mostly additive, which is good for concrete, right? Even if a new solution reduces carbon footprint by 5%, well, if you're already working with other materials that reduce it by 15, 20, 25, and you add another 5% reduction as a result of using an innovative material, that's a positive thing.

60:37 · Lionel Lemay
The research around compatibility needs to be done. So that does bring us to the end. I just want to thank Climate Earth for sponsoring this series, and Saskia who organizes them. Thank the experts on the panel today. You did a great job. And of course, the audience, where, typically we don't get enough questions to answer, and we didn't get to all of them today.

61:04 · Lionel Lemay
We got to most of them, thankfully. I do want to just say that our next session is on August 19th at 11:00 AM Pacific. The topic is going to be focused on how low-carbon concrete is shaping projects. Go to climateearth.com and browse to the resources section, to register for that, next webinar. So, see you next time.

61:29 · Closing voices
Bye. See you next time. Yeah.

Make concrete sustainability
easy with Climate Earth.